Do not go to the riverbank to see how big the flood is, and do not film or photograph at the water's edge. Stay well away from the river, and help anyone who needs it. • विपद्को यो समयमा कुनै पनि सूचना, फोटो/भिडियो आधिकारिक हो/होइन यकिन गरेर मात्र पोस्ट वा सेयर गर्नु हुन अनुरोध छ । सही र आधिकारिक सूचना मात्र सम्प्रेषण गरौं, भ्रामक सूचनाको पछि नलागौं।
← Back to Atlas

Damage

Damage assessment

Data updated 4 min ago · next update in 6 min

Bhotekoshi flood news
Looking for the latest flood updates…
1 · RDNA

RDNA preliminary · corridor assessment

NPC–NDRRMA preliminary RDNA board, 28 Bhadra 2082. Chitwan, Dhading, Gorkha, Nuwakot, Rasuwa.

Disaster impact and recovery need in NPR crore (and USD millions where printed). Not merged into NDRRMA casualty KPIs, uncontacted, or relief cash channels.

40,828.91NPR croreUSD 2,695.33 m
Total disaster impact
72,331.52NPR croreUSD 4,774.99 m
Recovery need
27,448.32NPR crore
Damage
13,380.58NPR crore
Losses
Corridor assessment

Affected totals

Buildings affected
7,570
Households affected
8,317
Population affected
32,963
Male 16,769 · Female 16,192

Buildings & facilities

Private houses
7,570 damaged
Public buildings
48 (35 full · 13 partial)
Schools
18 (11 full · 7 partial)
Health
7 facilities (4 destroyed · 3 partial)
Cultural heritage
~30 sites

Transport & energy

Energy
hydropower 13 · 759.025 MW · solar 5 · 24.36 MW
Roads
69 km damaged
Bridges
motorable 37 (33 washed) · suspension 68
Summary table
ClassDamageLossesEffectsEffects USD mShort (0–6 mo)LongRecoveryRecovery USD m
Social sectors6,785.102.006,787.10448.0582.8010,272.1910,354.99683.59
1.1 Private buildings6,388.48—6,388.48421.7448.009,534.729,582.72632.61
1.2 Public buildings264.59—264.5917.4711.80411.55423.3527.95
1.3 Education93.73—93.736.1910.50223.82234.3215.47
1.4 Health23.66—23.661.5612.5065.5078.005.15
1.5 Cultural heritage14.642.0016.641.10—36.6036.602.42
Productive sectors3,428.5311,608.8915,037.42992.7050.405,027.095,077.49335.19
2.1 Agriculture109.30—109.307.2235.00107.10142.109.38
2.2 Fisheries71.59—71.594.730.40106.99107.397.09
2.3 Livestock144.81—144.819.5615.00158.77173.7711.47
2.4 Banking72.4019.5991.996.07—108.60108.607.17
2.5 Economic activity / livelihood3,030.4311,589.3014,619.73965.13—4,545.654,545.65300.08
Infrastructure sectors17,234.691,769.6919,004.391,254.58674.3046,682.8947,357.193,126.30
3.1 Energy (hydropower)13,469.761,634.6915,104.45997.13105.0038,957.3039,062.302,578.71
3.2 Household renewables56.84—56.843.7510.00154.82164.8210.88
3.3 Roads2,207.25135.002,342.25154.62319.005,199.135,518.13364.28
3.4 Bridges1,135.11—1,135.1174.93155.001,661.171,816.17119.90
3.5 Telecom62.87—62.874.1534.0060.3094.306.23
3.6 WASH138.11—138.119.1251.30155.86207.1613.68
3.7 Irrigation / river training164.77—164.7710.88—494.30494.3032.63
Cross-cutting0.000.000.000.0066.005,121.345,187.34342.44
4.1 Debris0.00———16.0035.5451.543.40
4.2 DRR————35.009,440.319,475.31625.52
4.3 Inclusive recovery————15.00—15.000.99
Total27,448.3213,380.5840,828.912,695.33873.5071,458.0272,331.524,774.99

Counted separately — not merged into NDRRMA casualty KPIs, uncontacted, or relief cash channels.

2 · Copernicus

Vidur and the Trishuli corridor

EMSR927 AOI03 · GRA_MONIT01 · Monitoring 1 · 31 Aug 2026 · ITHACA / SERTIT · GLIDE FF-2026-000162-NPL

Satellite visual interpretation, not a police or NDRRMA sitrep. Not added to deaths, injured, uncontacted or rescued. ~5,000 people in this map are not added to the uncontacted total. Possibly damaged is a proximity proxy, not a confirmed count.

701.5ha
Landslide / flood area
~5,000
People in the mapped area
3,058
Buildings affected
3,001
Residential, inside the 3,058
49.8km
Road affected
26
Bridges destroyed, of 26 in the AOI
27ha
Power plant area
2ha
Helipad destroyed
Maps

EMSR927 grading maps

6

Satellite product maps reprinted by the Rasuwa flood bulletin. Copernicus does not publish this AOI as a live vector feed; these images are the grading.

EMSR927 AOI01 grading overview
EMSR927 AOI01 grading detail
EMSR927 AOI01 grading detail
EMSR927 AOI01 grading detail
EMSR927 grading infographic
EMSR927 grading infographic
1 / 6
Photographs

Syabrubesi and Timure

4

Ground photographs of the mapped area, from the same compilation. Captions are the bulletin’s. Not the national sitrep.

अनलाइनखबर · सेनाको ७ जना उद्धार रिपोर्ट
काठमाडौं पोस्ट · आज
रातोपाटी · आज
अनलाइनखबर · टिमुरे, स्याफ्रुबेँसी, रसुवागढी
1 / 4
ClassDestroyedDamagedPossibleAffectedIn the AOIShare
Hazard
Landslide701.5 ha——701.5——
People
Population———~5,000~25,00020%
Buildings
Residential buildings2,4472453093,00111,42926.3%
Correctional50242929100%
Other non-residential27102828100%
All buildings (sum)2,4792463333,05811,48626.6%
Transport
Cart track———37.196.338.5%
Local road———6.119.631.1%
Primary road———6.616.141.0%
Bridges and elevated highways24022626100%
Helipad2 ha0022100%
Facilities
Power plant constructions———2731.984.6%
Dams———0.30.3100%
Aqueducts———0.20.2100%
Heavy industry———0.50.5100%
Other civil works———5.95.9100%
Land cover
Forests———244.472933.5%
Mixed agriculture———3131132.527.6%
Inland wetlands———72.184.785.1%
Shrub———45.365.768.9%
Other land use———26.7100.226.6%

Possible damage is a proximity proxy, not a confirmed count. Affected is the sum of the damage classes. 3,058 is all buildings; 3,001 is residential inside that — do not add them.

Figures as of 14 Sep 2026 (RDNA 28 Bhadra · Copernicus EMSR927 AOI03 · NEA 10 Bhadra) · Copernicus EMS Rapid Mapping EMSR927 ↗ · NPC–NDRRMA preliminary RDNA ↗ · Rasuwa flood bulletin (compilation) ↗ · Nepal Electricity Authority ↗ · NEA via Ratopati (133+ uncontacted) ↗ · Copernicus portal ↗

3 · Power

Power · NEA urgent notice

Nepal Electricity Authority head office, Durbar Marg. Urgent notice, 10 Bhadra 2083 (26 August 2026). The Rasuwa flash flood damaged hydropower and transmission; supply is interrupted. Work is on to restore supply. Stay alert near the river and in risk areas. Do not believe rumours.

Source: Nepal Electricity Authority notice 2083/05/10. Projects with a blank remarks column are on this list but not marked as directly affected. Phone 01-4153007, 01-4153012.

431.1MW
On the list
276MW
Marked directly affected
133+
Hydropower staff uncontacted
NEA via Ratopati. Not added to the uncontacted total of about 5,326; the board no longer publishes a hydropower row.
60
Langtang project, still uncontacted
Inside the 133+, not on top of it. Unchanged.

Counted separately, not added to the uncontacted total of about 5,326

Inside the 133+, not on top of it

ProjectMWRemarks
RasuwagadhiHit111Directly affected · NEA subsidiary
Salasungi (Sanjen)78On the list, not marked hit
Upper Sanjen14.8On the list, not marked hit
Sanjen42.5On the list, not marked hit
ChilimeHit22Directly affected · NEA subsidiary
LangtangHit20Directly affected · IPP
Trishuli 3AHit60Directly affected · NEA
Upper Mailung14.8On the list, not marked hit
Mailung5On the list, not marked hit
TrishuliHit24Directly affected · NEA
DevighatHit14Directly affected · NEA
NEA SolarHit25Directly affected · NEA

Directly affected 276 MW. Trishuli 3B hub 220 kV substation also damaged. Blank-remarks plants are on the list, not marked hit.

NEA phones 01-4153007 · 01-4153012 · nea.org.np ↗

4 · Ecosystem

Ecosystem exposure

Overlap between the event footprint and Nepal reference layers — protected areas, Ramsar wetlands, and land cover. Exposure only; not damage grading.

Computing exposure…